Management Plan of Construction Sites and Fugitive Emission, Tainan County, 2007.

Absrtact
Acoording to evaluation regulation of “Management Plan of Construction Sites and Fugitive Emission” (hereafter called this project), Tainan County, 2007. The execution abstract of this project is listed as Table 1 which issuing the briefly description of each outcome of the project: 1. Analysis and Discussion The plan of Construction site’s pollution control is not only inline with the project standard, but also assists “Management of Construction site’s Air Pollution preventing facilities” that issues on July 1, 2004. Due to patrol work, we specially enhance on management’s reviewing and counseling. From the condition of progress, we selected the excellent construction site to be awarded. Moreover, we introduced and illustrated the importance of management issue on the propagandist conference. On the issue of maintaining the air quality, we encouraged volunteers to adopt roads and clean the street dust. We have accomplished 100 % execution that is over our expecting tagart during this project to August 8, 2008. 2. Main Working Conatins: 1. During this project period, we patrolled 7094 times on construction sites (included holiday patrolled 1003 times). Moreover, the result of patrol was filed into “Information System of Constuction Site’s Pollution management and Fee Collecting management, Environmental Protection Administration, Executive Yuan”. 2. From August 1, 2007 to July 31, 2008, there were total 6586 sites under the constuction in Tainan County. The Estimation of fugitive emission was 6337.27 tons, which averaged 528.16 tons per month. After proceeding the polltion controlling management, the actual amount of emission was reduced to 3547.38 tons, the average percentage of reduction was 44.02%. Among the 2359 constuction sites which under the management plan was contained the 87.69% total emission. 3. We held two constuciton prapagadize conference and printed out 300 prapagadize handbook during this project. In the conference, we specially illustrated the amendment according to “Management Plan of Construction Site’s Air Pllution Preventing Facities” which was revised on Oct. 24, 2007 4. The air pollution fees collecting statistic from Aug. 1, 2007 to July 31, 2008 is showed as the followings: Total number of constrcution sites declared the air pollution fees: 4895. Total revenue: 55,177,734 NT dollars. Highest amount of declaration: 4,952,527 NT dollars (R96S4044 Tainan-Rende section, Tainan-Guanmiao. Line of East-West Expressway System No. C822.Starts from 2-11 road in the west and ends at Provincial Highway No.1 in the east.) 5. Bureau of Environmental Protection, Tainan County continue the service window from last year. The average proceeding time is around 10 minutes per cases. Now, Tainan county government’s southern service center is also provided second service window in Gueiren township. 6. There were 22 construction sites assisted on adopting road dust cleaning during this project period. The total length of adoption road are 17,175 meters. The total length of street cleaning is 8590.38 kilometer by July 31, 2008 (included street scrubing 4,295.19 kilomete, street sweeping 4,295.19 kilometer). The amount of TSP reduction is 118.55 tons (amount of PM10 reduction is 22.33 tons). 7. We directed the construction sites in Tianan County for random testing on construction machines’ and tools’ oil. There are 27 construction sites and 39 construction machines and tools under inspection. The inspecting group identfy the unusual oil by the color and small among the 20 machines and tools for the further analysis. Result of the analysis showed 3 machines were over the regulation stardard (50ppmw), the unqualify percentage of random testing is 7.7%, the unqualify percentageof analysis is 15%. 8. The total numbers of alfresco combustion were 600 cases which discovered during the second season of rice cultivation in 2007. (216 cases were extinguished by the patrol team members). Among those alfresco combustion, there were 578 straw buring, 16 palnt-others buring (mainly weeds), and 6 tree leaves buring. The total amount of combustion were 698.14 tons, the amount of extinguishing fire were 122.62 tons which made the percentage of restraining alfresci burning to be 17.56%. 9. we popularized the concep of non-alfresco straw buring to the contracting and operating uint of farmers’ association and rice husking mill. There were 7 unit agrreded to operated this project up to Jan 1, 2008 which included Fang Rong rice production and marketing. The total contracted farmer were 577 people within 665.8 hectare of farm area. The estimation of restraining combustion amount is around 3994.8 tons. 10. This project mainly investigated the uncovered suferace on metropolital area, heavy popullated area, and main road (ex:TAI 1 SIAN and TAI 19 SIAN) during the execuation period. There were 48 uncovered surface added to this project within 69.67 hectares of listed controlling area. The total amounts of TSP emission were 24.67 tons per year. The improvement on the matter of uncover suferace was compeleted up to 22 cases that included improving area of 35.98 hectares. 11. During the project period, there were 3 prapagadize conference which illustrated the importance of reducing the praying cash combustion and centralizing combustion. Moreover, we popularized a acitivity of centralizing praying cash collecting on The Chungyuan Festival (Chinese Halloween). 12. The activity of centralizing praying cash collecting on The Chungyuan Festival (Chinese Halloween).was ended Aug 17, 2008. There were total 82 units cooperated this activity which included 7 temples, 33 constrcution sites, 17 commnunities, 11 pubic orgaizations, 5 people service sites, and 9 corperations. The total amounts of praying cash collecting is around 10980kg
Keyword
Granular pollutant、Escape source、Open burning、Paper money
Open
top